Framework Contract for Supply, Delivery and Offloading of road construction material and precast products for maintenance of Newcastle roads for a period of 36 months

Won by A M COMPILE TRADING

Newcastle Local Municipality · R 1 · 10 Apr 2026

The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.

Won by HUNGASANI TECHNICAL ENVIRONMENT AND PROJECTS

ESKOM · R 1 · 16 Jan 2025

The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.

Won by KEEN GROUP

ESKOM · R 1 · 16 Jan 2025

The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.

Won by FAIRBAIRN TECHNOLOGIES

ESKOM · R 1 · 16 Jan 2025

The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.

Won by YOMWENI TRADING ENTERPRISE

ESKOM · R 1 · 16 Jan 2025

The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.

Won by BISIFIELD

ESKOM · R 1 · 16 Jan 2025

The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.

Won by KIYAMA GENERAL TRADING

ESKOM · R 1 · 16 Jan 2025

The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.

Won by KATSHEPA CONSTRUCTION AND TECHNOLOGIES

ESKOM · R 1 · 16 Jan 2025

The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.

Won by IMBOKODO ELECTRICAL

ESKOM · R 1 · 16 Jan 2025

The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.

Won by MABONE ELECTRIC

ESKOM · R 1 · 16 Jan 2025

The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.

Won by AMIWARE

ESKOM · R 1 · 16 Jan 2025

The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.

Won by THUMNCU

ESKOM · R 1 · 16 Jan 2025

The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.

Won by UPHOFU SERVICES

ESKOM · R 1 · 16 Jan 2025

The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.

Won by T AND J ELECTRICAL

ESKOM · R 1 · 16 Jan 2025

The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.

Won by SXUZA CONTRACTORS

ESKOM · R 1 · 16 Jan 2025

The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.

Won by REAMOGELENG ELECTRICAL

ESKOM · R 1 · 16 Jan 2025

The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.

Won by PHAPHAMA ELECTRICAL ENGINEERING

ESKOM · R 1 · 16 Jan 2025

The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.

Won by RBPMM

ESKOM · R 1 · 16 Jan 2025

The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.

Won by HENQUE 2912

ESKOM · R 1 · 16 Jan 2025

The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.

Won by TFM BUSINESS ENTERPRISE

ESKOM · R 1 · 16 Jan 2025

The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.

Won by NKAZITHANDO TRADING

ESKOM · R 1 · 16 Jan 2025

The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.

Won by SYSTER CONSTRUCTION AND PROJECTS

ESKOM · R 1 · 16 Jan 2025

The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.

Won by NONSA PROJECTS

ESKOM · R 1 · 16 Jan 2025

The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.

Won by E-PROJECTS

ESKOM · R 1 · 16 Jan 2025

FOR THE PROVISION OF CATHODIC PROTECTION SPECIALIST TO FORM PART OF TRANSNET PIPELINES OWNERS TEAM TO ASSIST WITH THE MPP24 CP OPTIMISATION PROJECT

Won by ISINYITHI CATHODIC PROTECTION

Transnet SOC Ltd · R 1 · 15 Aug 2024

The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.

Won by NCEDEKA SECURITIES

ESKOM · R 1 · 16 Jan 2025

The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.

Won by WELCONY INVESTMENTS

ESKOM · R 1 · 16 Jan 2025

The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.

Won by ALEXADRAH THIRD 333OI TRADING

ESKOM · R 1 · 16 Jan 2025

The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.

Won by CHITIPA GROUP

ESKOM · R 1 · 16 Jan 2025

The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.

Won by SG AND ASSOCIATES

ESKOM · R 1 · 16 Jan 2025

The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.

Won by MASTECH GENERAL TRADING

ESKOM · R 1 · 16 Jan 2025

The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.

Won by UBUNTU BESIZWE CONSULTING AND BUSINESS SERVICES

ESKOM · R 1 · 16 Jan 2025

The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.

Won by BURLINGTON ELECTRICAL

ESKOM · R 1 · 16 Jan 2025

The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.

Won by BONISWA TRADING

ESKOM · R 1 · 16 Jan 2025

The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.

Won by SINDICICH ELECTRICAL

ESKOM · R 1 · 16 Jan 2025

The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.

Won by AFAT PROJECTS

ESKOM · R 1 · 16 Jan 2025

The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.

Won by AFRICAN ICON ELECTRICAL

ESKOM · R 1 · 16 Jan 2025

The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.

Won by KALLU ELECTRICAL

ESKOM · R 1 · 16 Jan 2025

The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.

Won by AMILTON HOLDINGS

ESKOM · R 1 · 16 Jan 2025

PS 01/2025: SUPPLY, INSTALLATION AND MAINTENANCE OF THE CURRENT SURVEILLANCE CAMERA SYSTEM FOR A PERIOD OF THREE YEARS

Won by COMPUTERS GALORE

Alfred Duma Local Municipality · R 1 · 23 May 2025