Awards recorded
4 859
Total disclosed value
R 87 888 681 179
Most active buyer
ESKOM
Framework Contract for Supply, Delivery and Offloading of road construction material and precast products for maintenance of Newcastle roads for a period of 36 months
Won by A M COMPILE TRADING
Newcastle Local Municipality · R 1 · 10 Apr 2026
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
Won by HUNGASANI TECHNICAL ENVIRONMENT AND PROJECTS
ESKOM · R 1 · 16 Jan 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
Won by KEEN GROUP
ESKOM · R 1 · 16 Jan 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
Won by FAIRBAIRN TECHNOLOGIES
ESKOM · R 1 · 16 Jan 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
Won by YOMWENI TRADING ENTERPRISE
ESKOM · R 1 · 16 Jan 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
Won by BISIFIELD
ESKOM · R 1 · 16 Jan 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
Won by KIYAMA GENERAL TRADING
ESKOM · R 1 · 16 Jan 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
Won by KATSHEPA CONSTRUCTION AND TECHNOLOGIES
ESKOM · R 1 · 16 Jan 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
Won by IMBOKODO ELECTRICAL
ESKOM · R 1 · 16 Jan 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
Won by MABONE ELECTRIC
ESKOM · R 1 · 16 Jan 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
Won by AMIWARE
ESKOM · R 1 · 16 Jan 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
Won by THUMNCU
ESKOM · R 1 · 16 Jan 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
Won by UPHOFU SERVICES
ESKOM · R 1 · 16 Jan 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
Won by T AND J ELECTRICAL
ESKOM · R 1 · 16 Jan 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
Won by SXUZA CONTRACTORS
ESKOM · R 1 · 16 Jan 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
Won by REAMOGELENG ELECTRICAL
ESKOM · R 1 · 16 Jan 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
Won by PHAPHAMA ELECTRICAL ENGINEERING
ESKOM · R 1 · 16 Jan 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
Won by RBPMM
ESKOM · R 1 · 16 Jan 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
Won by HENQUE 2912
ESKOM · R 1 · 16 Jan 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
Won by TFM BUSINESS ENTERPRISE
ESKOM · R 1 · 16 Jan 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
Won by NKAZITHANDO TRADING
ESKOM · R 1 · 16 Jan 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
Won by SYSTER CONSTRUCTION AND PROJECTS
ESKOM · R 1 · 16 Jan 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
Won by NONSA PROJECTS
ESKOM · R 1 · 16 Jan 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
Won by E-PROJECTS
ESKOM · R 1 · 16 Jan 2025
FOR THE PROVISION OF CATHODIC PROTECTION SPECIALIST TO FORM PART OF TRANSNET PIPELINES OWNERS TEAM TO ASSIST WITH THE MPP24 CP OPTIMISATION PROJECT
Won by ISINYITHI CATHODIC PROTECTION
Transnet SOC Ltd · R 1 · 15 Aug 2024
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
Won by NCEDEKA SECURITIES
ESKOM · R 1 · 16 Jan 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
Won by WELCONY INVESTMENTS
ESKOM · R 1 · 16 Jan 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
Won by ALEXADRAH THIRD 333OI TRADING
ESKOM · R 1 · 16 Jan 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
Won by CHITIPA GROUP
ESKOM · R 1 · 16 Jan 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
Won by SG AND ASSOCIATES
ESKOM · R 1 · 16 Jan 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
Won by MASTECH GENERAL TRADING
ESKOM · R 1 · 16 Jan 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
Won by UBUNTU BESIZWE CONSULTING AND BUSINESS SERVICES
ESKOM · R 1 · 16 Jan 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
Won by BURLINGTON ELECTRICAL
ESKOM · R 1 · 16 Jan 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
Won by BONISWA TRADING
ESKOM · R 1 · 16 Jan 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
Won by SINDICICH ELECTRICAL
ESKOM · R 1 · 16 Jan 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
Won by AFAT PROJECTS
ESKOM · R 1 · 16 Jan 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
Won by AFRICAN ICON ELECTRICAL
ESKOM · R 1 · 16 Jan 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
Won by KALLU ELECTRICAL
ESKOM · R 1 · 16 Jan 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
Won by AMILTON HOLDINGS
ESKOM · R 1 · 16 Jan 2025
PS 01/2025: SUPPLY, INSTALLATION AND MAINTENANCE OF THE CURRENT SURVEILLANCE CAMERA SYSTEM FOR A PERIOD OF THREE YEARS
Won by COMPUTERS GALORE
Alfred Duma Local Municipality · R 1 · 23 May 2025
| Contract | Awarded to | Buyer | Value |
|---|---|---|---|
| Framework Contract for Supply, Delivery and Offloading of road construction material and precast products for maintenance of Newcastle roads for a period of 36 months | A M COMPILE TRADING | Newcastle Local Municipality | R 1 |
| The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required. | HUNGASANI TECHNICAL ENVIRONMENT AND PROJECTS | ESKOM | R 1 |
| The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required. | KEEN GROUP | ESKOM | R 1 |
| The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required. | FAIRBAIRN TECHNOLOGIES | ESKOM | R 1 |
| The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required. | YOMWENI TRADING ENTERPRISE | ESKOM | R 1 |
| The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required. | BISIFIELD | ESKOM | R 1 |
| The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required. | KIYAMA GENERAL TRADING | ESKOM | R 1 |
| The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required. | KATSHEPA CONSTRUCTION AND TECHNOLOGIES | ESKOM | R 1 |
| The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required. | IMBOKODO ELECTRICAL | ESKOM | R 1 |
| The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required. | MABONE ELECTRIC | ESKOM | R 1 |
| The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required. | AMIWARE | ESKOM | R 1 |
| The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required. | THUMNCU | ESKOM | R 1 |
| The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required. | UPHOFU SERVICES | ESKOM | R 1 |
| The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required. | T AND J ELECTRICAL | ESKOM | R 1 |
| The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required. | SXUZA CONTRACTORS | ESKOM | R 1 |
| The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required. | REAMOGELENG ELECTRICAL | ESKOM | R 1 |
| The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required. | PHAPHAMA ELECTRICAL ENGINEERING | ESKOM | R 1 |
| The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required. | RBPMM | ESKOM | R 1 |
| The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required. | HENQUE 2912 | ESKOM | R 1 |
| The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required. | TFM BUSINESS ENTERPRISE | ESKOM | R 1 |
| The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required. | NKAZITHANDO TRADING | ESKOM | R 1 |
| The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required. | SYSTER CONSTRUCTION AND PROJECTS | ESKOM | R 1 |
| The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required. | NONSA PROJECTS | ESKOM | R 1 |
| The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required. | E-PROJECTS | ESKOM | R 1 |
| FOR THE PROVISION OF CATHODIC PROTECTION SPECIALIST TO FORM PART OF TRANSNET PIPELINES OWNERS TEAM TO ASSIST WITH THE MPP24 CP OPTIMISATION PROJECT | ISINYITHI CATHODIC PROTECTION | Transnet SOC Ltd | R 1 |
| The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required. | NCEDEKA SECURITIES | ESKOM | R 1 |
| The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required. | WELCONY INVESTMENTS | ESKOM | R 1 |
| The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required. | ALEXADRAH THIRD 333OI TRADING | ESKOM | R 1 |
| The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required. | CHITIPA GROUP | ESKOM | R 1 |
| The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required. | SG AND ASSOCIATES | ESKOM | R 1 |
| The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required. | MASTECH GENERAL TRADING | ESKOM | R 1 |
| The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required. | UBUNTU BESIZWE CONSULTING AND BUSINESS SERVICES | ESKOM | R 1 |
| The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required. | BURLINGTON ELECTRICAL | ESKOM | R 1 |
| The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required. | BONISWA TRADING | ESKOM | R 1 |
| The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required. | SINDICICH ELECTRICAL | ESKOM | R 1 |
| The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required. | AFAT PROJECTS | ESKOM | R 1 |
| The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required. | AFRICAN ICON ELECTRICAL | ESKOM | R 1 |
| The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required. | KALLU ELECTRICAL | ESKOM | R 1 |
| The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required. | AMILTON HOLDINGS | ESKOM | R 1 |
| PS 01/2025: SUPPLY, INSTALLATION AND MAINTENANCE OF THE CURRENT SURVEILLANCE CAMERA SYSTEM FOR A PERIOD OF THREE YEARS | COMPUTERS GALORE | Alfred Duma Local Municipality | R 1 |